What counts as a revision and what counts as new work?

A revision brings delivered work closer to what you both agreed; new work changes or adds to what you agreed. If a request points at the approved design, the page list or the written scope and says "this does not match yet", it is a revision. If it adds a page, a feature or a direction nobody agreed, it is new work, however small it looks.

Both are normal on a website project. Trouble starts when nobody decided in advance how many revisions are included and how new requests are priced. Here is a simple way to set that up so neither side has to argue about it later.

What does the difference look like on a real website?

RequestTypeWhy
The hero spacing does not match the approved Figma frameRevisionThe approved design is the reference
The mobile menu looks different from the mobile designRevisionThe mobile frames were part of the scope
Swap one image on an agreed page for a better one you supplyRevisionA small change inside agreed work
Add a pricing page that was not on the page listNew workIt adds to the scope
Replace the approved home page layout with a new ideaNew workThe approval has already happened
Send form leads to a different CRM than the one agreedNew workIt is a different integration

A bug is a third category. If something in the scope does not work, such as a form that fails or a link that breaks, fixing it is part of delivering the work, and it should not use up a revision round.

How many revision rounds should you agree, and when?

I usually suggest two rounds per milestone. A round is one consolidated list of changes, sent together, rather than a stream of single messages. Two rounds are usually enough: the first catches the big issues and the second polishes.

When the rounds happen matters more than how many there are. A change in the design file is quick; the same change after the page is built takes longer, and after content is loaded it takes longer again. That is why the larger rounds belong at the design stage of a Figma to website project and keep build-stage rounds for matching the approved design, not redesigning it. For a single landing page, one design round and one build round are often enough.

How do you write revisions into the scope of work?

Upwork recommends a formal Scope of Work that lists the key requirements, the deliverables and any revisions included in the agreed price, and says each fixed-price milestone should have a clear deliverable, an estimated delivery date and an agreed payment amount (Upwork on scoping a project). For revisions, a few lines in that document are enough:

  • The number of rounds per milestone, and what one round is.
  • The references every round is checked against: the approved design, the page list and the written scope.
  • How quickly each round is turned around once the list arrives.
  • How new requests are handled: quoted separately and added as their own milestone.

Written that way, a disagreement becomes a quick check against the document rather than a debate about what someone remembers saying.

How does requesting changes work on an Upwork milestone?

When the developer submits a milestone, you can approve it or request changes. If you request changes, payment is not released until the developer resubmits, and a new 14-day review window starts on resubmission (Upwork: review and pay for fixed-price milestones). If you take no action within the review window, Upwork treats it as approval and releases the funds automatically (Upwork milestone guide). The full review cycle is in my article on fixed price or hourly on Upwork.

In practice, one request for changes makes a clean marker for one revision round: you send the consolidated list with the request, the developer resubmits, and that round is closed. If the work happens on your live website rather than in the workroom, Upwork lets you pay with "Pay now" without a workroom submission, and changes are then requested by message (same page), so keep the round lists in Upwork Messages.

What should you do when a request is new work?

Give it its own milestone. On a fixed-price contract, milestones can be added, deleted or edited while the contract runs (Upwork contract types), and you can plan them all upfront or add more as the contract evolves (Upwork milestone guide). Only one milestone can be funded at a time, so the new one is activated and funded after the current one is released (same guide).

A good new milestone reads like the original ones: a clear deliverable, a delivery date and a price. "Add a pricing page with three plan cards and a comparison table, in the approved style, delivered with the final milestone" is easy to agree and easy to check. Stretching an existing milestone to cover extra work blurs what you are approving, so it is worth avoiding even when the addition is small.

If small extra requests keep coming after launch, an hourly arrangement for ongoing edits is usually simpler than pricing each one.